Western Petroleum Management
Construction
Drilling
Completions
Pipelines
Abandonments
General Oilfield Maintenance
Oil Sands Projects
Property Evaluation & Management
Home Page
WPM International

4434 - 10th Street N.E.
Calgary, AB
Canada
T2E 6K3

Phone: (403) 266-3938

Fax: (403) 266-3937

Email: info@westpetro.com

 

About Us Services Testimonials Clients HSE Contact Us
Drilling Home page

WPM can design and implement a technically superior drilling program where we focus on safety, regulatory and engineering requirements, plus operational efficiency both from a technical and logistics perspective to ensure all contingencies are reviewed prior to mobilizing high cost equipment and personnel. Plus we will develop a comprehensive AFE that is designed based on competitive bids for equipment and personnel and reflects the true cost of your project. All we require from the client is a geological prognosis and potential daily production volumes and we can manage all the issues from “construction to production.” WPM will ensure that all your regulatory issues are managed properly from well licensing to end of well AEUB submissions. If the client only requires the services of a field consultant to report directly to the operator then we can also supply that service. Whatever your requirements, WPM has the capability to fill your needs.

  1. Vertical Drilling
    • Conventional wells from shallow gas wells to deep wells, 4,000 meters+ including both development and exploration wells.
    • Planned and utilized both water based and oil based mud systems.
    • Large diameter well bores (28”) and large diameter casing (24”).
    • Coil Tubing drilling.

  2. Directional and Horizontal wells
    • New Drills - short, medium and long radius wells including extended reach wells (6000 meters) utilizing rotary steerable tools. We have experience drilling carbonates and shallow unconsolidated oil sands.
    • Re-entry horizontal wells.
    • Under-balance wells.
    • Multi-leg horizontal wells to 6,000 meters.
    • Shallow and deep directional wells.

  3. Heavy Oil Core Holes
    • WPM can manage all your project needs with regards to your core hole program. We have the experience and resources to supply all management and supervision requirements including:
      • Pre-survey scouting
      • Supervise surveying of access and well site
      • OSE Application
      • First Nation Consultation
      • Request, review bids and recommend third party services
      • Develop AFE
      • Designing a drilling/coring program
      • Well licensing
      • Well site construction
      • Drill, core and abandon your well as per clients and AEUB requirements
      • Site reclamation and submission to ASRD for reclamation certificate
      • End of well submissions to AEUB
      • End of project report to Client